Shutoff Valves
Valve # | Location | Shuts off? |
---|---|---|
G1 | Room 20 | Thermific boiler in Rm 20, for 2005 addition |
G2 | Room 20 | A.O. Smith WH #2 in Rm 20, for 2005 & 2016 additions |
G3 | Room 20 | A.O. Smith WH #1 in Rm 20, for 2005 & 2016 additions |
G4 | Room 101C | Furnace in Rm 101C |
G5 | Room 112C | Furnace in Rm 112C |
G6 | Room 114 | A.O. Smith WH #3 in Rm 114, for LS |
G7 | Room 114 | Weil McLain boiler in Rm 114, for LS |
G8 | Room 114 | PK boiler in Rm 114, for LS |
G9 | Room 120D | Carrier furnace in Rm 120D, for Rm 118, 120A-C |
G10 | Room 133B | Carrier RTU outside Rm 133 |
G11 | Outside Room 133 | Carrier RTU outside Rm 133 |
G12 | Room 124 | All lab gas for Rm 124 |
G13 | Room 128 | All lab gas for Rm 128 |
G14 | Room 202 | Trane furnace in Rm 202 for Rm 200 |
G15 | Room 202 | Trane furnace in Rm 202 for Rm 204 |
G16 | Room 208 | Trane furnace in Rm 208 for Rm 206 |
G17 | Room 208 | Trane furnace in Rm 208 for Rm 210 |
G18 | Room 214 | Trane furnace in Rm 214 for Rm 212 |
G19 | Outside of POD, below the gas meter | All gas, entire building. Requires an adjustable wrench. |
G20 | Room 222C | Carrier furnace in Rm 222C for entire Admin Wing |
G21 | Room 228A | Trane furnace in Rm 228A for Rm 226A |
G22 | Room 228B | Trane furnace in Rm 228B for Rm 232 |
G23 | Roof of 2005 addition, via Rm 239B | Gym RTU. Requires and adjustable wrench. |
G24 | Room 248 | Lochinvar boiler in Rm 248 for 2016 addition |
G25 | Roof of 2016 Addition, via Rm 248 | Carrier RTU for 2016 addition. Requires an adjustable wrench. |